22.5° DWV Offset Charts
Not on the 45° chart? grab 22's, Not on the 22.5° chart? use 45's.
Great for:
• First floor toilet/flange offsets
• First floor shower drains
• Tight offsets where accuracy matters
No math required for most offsets. For tight tolerances a fraction chart is directly below the main chart.
• Faster offset layout.
• Less messing with fittings.
• No calculator or formula.
• Reduces measuring mistakes.
• Covers 1 1/2", 2" and 3" pipe
• Fitting take-offs already figured for.
Made from heavy duty 12 mil vinyl
Get accurate offset cut lengths in seconds --- without the slow math.
--Patent Pending
• Mounts directly to either side of your Milwaukee Fuel Hackzall .
• Designed to pair with the 45° Offset Chart for quick 22.5° and 45° offsets.
• Faster layout with less measuring and calculating.
SHIPPING & FULFILLMENT
Orders may ship sooner when inventory is on hand. Please allow 5-10 Business days for processing during periods of high order volume.
